ClimsTech

Case studies

Real engagements. Verified outcomes.

Most client names are withheld by agreement — clients are named only with their permission. Every architecture, decision and metric is real, verified with the engagement owner.

ANS Commerce logoANS Commerce (Flipkart group) · AWS · Azure · GCP

Flagship

Modernising a high-growth commerce platform across AWS, Azure and GCP

awsazuregcpvm-heavy · manual changesthe engineering1terraform foundations2ci/cd on jenkins3ec2 → gke re-platforming4cost governanceone toolchain, three workstreamsone governed platformrepeatable · container-basedconsistent delivery controls~30% lower cost in the verified scope

Working constraints

  • A live platform — no disruptive cutovers
  • Three independent cloud environments
  • An existing Terraform and Jenkins toolchain to build on

Measured outcomes

3 clouds

AWS, Azure and GCP

EC2 → GKE

VM-to-container re-platforming

~30%

Cost reduction in confirmed scope

Principal-led

Senior engineering ownership

Client confirmation

ClimsTech worked closely with our engineering team on cloud infrastructure and DevOps for a demanding ecommerce environment — a hands-on approach to automation, scalability and platform operations, adapting well to peak-business priorities.
Sushant Puri, Co-FounderANS Commerce (Flipkart group)

Selected engagements, organised by the problem solved.

Showing 15 engagements — every metric verified with the engagement owner.

Scale & platformCricRadio · Digital media

Built for traffic that does not arrive gradually

Separated synchronous traffic from background workloads, calibrated autoscaling through staged load tests, Redis protecting the database.

99.97%

peak-event availability · p95 held

Scope: 120,000+ concurrent-user scenario validated

Staged production-like load test + live peak events

Reliability & operationsOnline marketplace

Turning fragmented monitoring into an operating system for reliability

One observability framework across the estate — ownership and escalation defined on every alert; noise down 68%.

38 min

mean time to recovery (from 2h 20m)

Scope: 92 workloads across 14 AWS accounts

Production result — 14-account estate

Scale & platformE-commerce technology

Preparing a commerce platform for four times normal transaction volume

Re-architected deployment, observability, rollback and capacity testing ahead of peak season.

99.98%

availability at 4.2× normal volume

Production result — seasonal peak

SecurityFinTech & digital lending

From manually created infrastructure to controlled, auditable delivery

Manually created infrastructure replaced with controlled, auditable, fully version-controlled delivery.

45 min

provisioning (from 3 days) · 58% fewer config incidents

Production result — regulated environment

Cost optimisationB2B SaaS

Reducing cloud expenditure without reducing operational confidence

Rightsizing, scheduling, commitments and tagging — with an ownership model that keeps the bill down after handover.

31%

lower monthly cloud spend, availability preserved

Scope: 180+ resources assessed; 97% of spend allocated to owners

Production result — verified billing scope

SecurityDigital services

Finding security issues while they are still inexpensive to fix

Security checks inline in delivery, with risk-based release gates, ownership, time-bound exceptions and retesting.

72%

fewer critical findings reaching production

Scope: 95% automated coverage; remediation 18 → 7 days

Production result — release cycles

Delivery automationEnterprise software

Coordinating application and database change as one release system

Database change as versioned, validated migrations coordinated with application delivery — gates, approval and rollback in the pipeline.

60%

fewer failed production releases · DB deploys 50 → 14 min

Scope: 180+ migrations version-controlled

Production result — engagement release cycles

Migration & modernisationTravel technology

Moving a live travel platform to AWS without betting everything on one cutover

Dependency-grouped waves onto Terraform-built AWS, with rehearsed cutovers and a proven rollback per wave.

<90 min

final cutover disruption · 29% lower operating cost

Scope: 76 VMs · ~38 TB moved in dependency-grouped waves

Production migration — live booking platform

Read the work. Then diagnose your own platform.

The Reality Check tools run the same judgement on your numbers — two minutes each, in your browser. No signup.